Some Commercial Scale Key Milestone Projects

AEC Life.png

Cavalier 999 KW
Cavalier abattoir project is based in Cullinan outside of Pretoria. It was installed in 2 months from start to finish. Project is Grid connected to Eskom with full Island mode ability to be able to run Hybrid mode with Generators.

AEC Cav.jpg

Sappi Head Office 120 KW
Sappi Head Office project is based in Rosebank Johannesburg. It was installed in 1 months from start to finish. Project is Grid connected to JHB Power with full Island mode ability to be able to run Hybrid mode with Generators and fully integrated into SCADA system.

AEC Sappi.jpg

Barrows Waverly 1 184 KW
Waverly 1 project is based in Waverly Johannesburg. It was installed in 2 months from start to finish. Project is Grid connected to JHB Power.

AEC BAr.jpg

Barrows Waverly 2 173 KW
Waverly 2 project is based in Waverly Johannesburg. It was installed in 2 months from start to finish. Project is Grid connected to JHB Power.

AEC Bar1.jpg

Cavalier 150 KW
Cavalier abattoir project is based in Cullinan outside of Pretoria. It was installed in 2 months from start to finish. Project is Grid connected to Eskom with full Island mode ability to be able to run Hybrid mode with Generators.

AEC Cav2.jpg

© 2021 by AEC.
Proudly created with Wix.com

1061 Frederik Lane

Eldoraigne, Centurion

South Africa

+27 12 004 0067

info@autoconcept.biz

  • Wix Facebook page
  • Wix Twitter page
  • Wix Google+ page
bottom of page